There is a lot happening with Tesla Energy.
Powerwall3 rolled out. We are on the second generation Megapack with the plant in China being built. On top of that, in about 18 months, Megapack3 will be released, with the potential to plug the lines right into the unit.
In this video I discuss how this is shaping up to be a $100 billion (in annual revenues) division for Tesla. If they get 5-6 plants built by the end of the decade, we could see those types of numbers.
▶️ 3Speak